CAUTION:
Plasterboard Duct Protection Systems are not designed to support
the weight of personnel, storage of goods or additional plant.
|
|
|
Construction
Details
FRL
60/60/60 Duct Protection Soffits to Unlined Ducts
Erect framing constructed from CH studs placed horizontally
at 600mm centres fitted into J-Runner framing at the ceiling edges.
Place 25mm Boral Shaft Liner Panels between H flanges of
CH studs.
Screw attach shaft liner panels to upper flange of J-Runners
with 45mm gypsum screws at 200mm centres.
Screw attach 2 layers of 16mm Boral Firestop Plasterboard
to bottom flange of CH studs & J-Runners.
Apply bottom layers across the bottom flanges of framing
staggering all joints min. 600mm.
Screw fasten sheets at 300mm in field of board and 200mm
centres on edges and ends.
FRL
90/90/90 Duct Protection Soffits to Lined and Unlined Ducts
Erect framing constructed from CH studs placed horizontally
at 600mm centres fitted into J-Runner framing at the ceiling edges.
Place 25mm Boral Shaft Liner Panels between H flanges of
CH studs.
Screw attach shaft liner panels to upper flange of J-Runners
with 45mm gypsum screws at 200mm centres.
Screw attach 3 layers of 16mm Boral Firestop Plasterboard
to bottom flange of CH studs & J-Runners.
Apply the first two layers across the bottom flanges staggering
all joints min. 600mm.
Screw fasten sheets at 300mm in field of board and 200mm
centres on edges and ends.
Apply bottom (third) layer perpendicular to the previous
layers, and screw fasten to framing at 300mm in field of board and
200mm centres on edges and ends.
|
|
|
FRL 120/120/120 Duct Protection Soffits to Unlined Ducts
Erect framing constructed from CH studs placed horizontally
at 600mm centres fitted into J-Runner framing at the ceiling edges.
Place 25mm Boral Shaft Liner Panels between H flanges of
CH studs.
Screw attach shaft liner panels to upper flange of J-Runners
with 45mm gypsum screws at 200mm centres.
Screw attach 3 layers of 16mm Boral Firestop Plasterboard
to bottom flange of CH studs & J-Runners.
Apply the first two layers across the bottom flanges staggering
all joints min. 600mm.
Screw fasten sheets at 300mm in field of board and 200mm
centres on edges and ends.
Apply bottom (third) layer perpendicular to the previous
layers, and screw fasten to framing at 300mm in field of board and
200mm centres on edges and ends.
Screw fix 100mm wide cover strips of 10mm Standard Core Plasterboard
over exposed top flanges of steel framing.
FRL
120/120/120 Duct Protection Soffits to Lined Ducts
Construction as for unlined ducts but without 10mm cover strips.
|
|